Installation Details Provided

  1. Meet with maintenance personnel to go over the details of all vehicles to be surveyed
  2. Evaluate the DC voltage, constant and switched, that will be used to power the equipment being installed.
  3. Indicate with drawings and pictures the best point to connect to and the optimum point to strain relief the wiring.
  4. Identify the best connection method.
  5. Identify all discrete connection points, best cable routing, and connection method.
  6. Determine the optimal location for all antennas and Coax routing.
  7. Determine the optimal location for mounting components.
  8. Determine the best mounting method and hardware.
  9. Evaluate existing components on the vehicle that will be interfaced to such as Cell Modems, Cad/Avl Systems
  10. Create an installation document with all information and pictures.